The Emerald Water System Disinfection Upgrade, consists of installing a UV water treatment plant so that the Emerald system would comply with the two-barrier standards for disinfectant, and as a result, it will significantly reduce the use of disinfection chemicals.
Products specifications
| Attribute name | Attribute value |
|---|
| Category | Infrastructure Facilities |
| Location | Whistler, British Columbia |
| Client | OPUS Canada/Resort Municipality of Whistler (2015) |
The Emerald Water System Disinfection Upgrade, consists of installing a UV water treatment plant so that the Emerald system would comply with the two-barrier standards for disinfectant, and as a result, it will significantly reduce the use of disinfection chemicals.
OPUS Canada designed the system while Integral Engineering was responsible for structural design and construction services of this 10 m x 12 m one storey post disaster building consisting of a heavy timber truss on top of reinforced masonry walls on top of heavy reinforced base slab/mat foundation.