Integral-Engineering
Updated October 2012
  • Home
  • Integral Resources
  • Services
  • Key Personnel
  • Contact

Construction Engineering

Our Construction Engineering Services include Erection Design, Launch Design, Quality management plan, Traffic management plan and Construction Management. 
The above, concerns the planning and management of the construction of structures such as buildings, bridges and temporary structures. Upon request of our clients, we will be engaged in the design of temporary structures (i.e.
formwork, falsework, scaffolding, etc.), quality assurance and quality control (QA/QC), concrete mix design, cost estimating, planning and scheduling and safety engineering. 

Our projects in recent years include:

Bridges: British Columbia and Yukon

>Canada Line Rapid transit project Vancouver:                
                ■ North Arm Bridge
                ■ Middle Arm Bridge
                ■ Elevated guideway
>Mad River in Clear Water
>Serpentine River in Surrey
>North Thompson River in  Birch  Island
>KSI Andigwaalee River
>Greenville Creek in Terrace
>Holly Bridge Way in Richmond
>Farewell Canyon
>Pine River crossing Pipeline erection design
>Silver Hope River Crossing Pipeline erection design
>Donjeck River, Yukon
>Cayoosh Creek Bridge and Boulder Creek Bridges, Lillooet, BC
>Admirals Bridge, Little Fork Bridge and Zeballos Rd  Bridge inVancouver Island, BC
>Bissette Creek Bridge, Dawson Creek, BC
>Darrel Bay Terminal, Squamish and Westridge Dock, Burnaby, BC
>Nordenskiold River Bridge, Yukon
>Kakisa River Bridge, Yukon

Projects Highlights:

ProjectsOverview
File Size: 1302 kb
File Type: pdf
Download File

Bridges: Alberta

>Waskahigan River
>Little Smoky River in  Valleyview
>Bow River, Banf National Park, AB
>Trans Canada Highway Twinning, 3 bridge is Banf

Buildings: Greater Vancouver

>Royal Columbian Hospital Seismic upgrade, New Westminster
Login Page