The riprap of the dam was designed and installed previously for the seepage control of system on the east abutment of the Dam. The main purpose of the riprap was to protect the shoreline within the dam area. The additional structure was designed by Integral Engineering to be safely added to the existing overflow cascade structure. The construction services including the material review, inspections, response to RFIs, and change orders were also provided by Integral.

Products specifications
Attribute nameAttribute value
CategoryInfrastructure Facilities
LocationNorth Vancouver, BC
ClientWSP/ Metro Vancouver

The riprap of the dam was designed and installed previously for the seepage control of system on the east abutment of the Dam. The main purpose of the riprap was to protect the shoreline within the dam area. The additional structure was designed by Integral Engineering to be safely added to the existing overflow cascade structure.  The construction services including the material review, inspections, response to RFIs, and change orders were also provided by Integral.

Share this project