The riprap of the dam was designed and installed previously for the seepage control of system on the east abutment of the Dam. The main purpose of the riprap was to protect the shoreline within the dam area. The additional structure was designed by Integral Engineering to be safely added to the existing overflow cascade structure. The construction services including the material review, inspections, response to RFIs, and change orders were also provided by Integral.
Products specifications
Attribute name | Attribute value |
---|
Category | Infrastructure Facilities |
Location | North Vancouver, BC |
Client | WSP/ Metro Vancouver |
The riprap of the dam was designed and installed previously for the seepage control of system on the east abutment of the Dam. The main purpose of the riprap was to protect the shoreline within the dam area. The additional structure was designed by Integral Engineering to be safely added to the existing overflow cascade structure. The construction services including the material review, inspections, response to RFIs, and change orders were also provided by Integral.