The project included the inspection and reporting of the following bridges: • Barnston Bridge, Unnamed Creek Bridge, Westcon Overpass Bridge, South Approach Viaduct, North Approach Viaduct, 199A Street Viaduct, 201 Street Viaduct, Cyclist and pedestrian ramp, Maple meadows Viaduct, Maple meadows Off Ramp, Lougheed On- Ramp, Abernethy Connector.
Products specifications
Attribute name | Attribute value |
---|
Category | Bridge Inspection |
Location | Between Langley and Maple Ridge, BC |
Client | Bilfinger Berger Investment |
The project included the inspection and reporting of the following bridges:
- Barnston Bridge, Unnamed Creek Bridge, Westcon Overpass Bridge, South Approach Viaduct, North Approach Viaduct, 199A Street Viaduct, 201 Street Viaduct, Cyclist and pedestrian ramp, Maple meadows Viaduct, Maple meadows Off Ramp, Lougheed On- Ramp, Abernethy Connector.